Summit Construction was proud to help bring the Christ the King Chapel to life, contributing a wide range of services that combined craftsmanship with attention to detail. Our work included intricate exterior structural cold-formed metal framing, rough carpentry and blocking, exterior gypsum sheathing, thermal insulation, and spray foam insulation to ensure both durability and efficiency.
Inside the chapel, we handled interior vapor barriers, joint sealants, and the installation of a high-end architectural door, frame, and hardware package. The interior also features non-structural metal framing, level 5 finished drywall, and custom FRP and GFRG architectural shapes and trim that add to the chapel’s timeless character. Our team also installed acoustic ceilings and completed the painting, making sure every finish matched the project’s high standards.
The result is a space that beautifully blends form and function, creating a lasting landmark for the Front Royal community.
Front Royal, VA

