Graystone Industrial Center Phase II – Building 3 is part of a multi-building industrial development designed to accommodate manufacturing, distribution, and warehouse operations within the growing Eastern Panhandle market. The project included construction of a modern industrial facility with flexible space to support a variety of tenant needs and operational requirements.

Summit Construction provided cold-formed metal framing, thermal insulation, gypsum drywall, acoustical ceilings, and installation of doors, frames, and hardware. The work supported the completion of office, support, and interior build-out areas within the facility, contributing to a functional and durable environment suited for industrial and warehouse operations.

Winchester, VA 238,000 sqft.